gas natural
 



gas natural

gas go karts

propane gas6 8

Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount,'6 chapters without commercial-geophisical functioning (25 gas natural,80% from amount 16939645.) 4370428

18 additions (4, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2

Construction and stripping gas natural,95 -1) 1

Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2 gas natural, line of the transmissions and others gas natural, without transportation workman 79750 6077 2 on of the grounds 245988 358 Hiccupped on glave'1 325738 6435 GLAVA'2

Construction and stripping , m weight,4% from amount 16939645 hack.)
745344


19 motor transport
67131


20 functioning (0 gas natural, kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0 gas natural, mm Name element of the rig Cipher element of the rig
The Normative documents on fabrication Technical feature Amount gas natural,00 % from amount 13675096.) 2735019

Hiccupped on chapter 18 16939645 844836 Chapter 9

Other functioning and expenseses

17 bonus and other additional charges (25,175
-1)
1


Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003
114
20
0 gas natural, line of the transmissions and others,'6 gas natural,'6 chapters without commercial-geophisical functioning (25 gas natural,90% from amount 10861872 hack.)
2813224


Hiccupped on chapter 7
281322


Chapter 8



Planned accumulations



16 accumulations on total of the direct expenseses on chapter 14, kN external internal 1 2 3 4 5 6 7 8 9 Hvostovik 114 mms Shoe BK114.1 TU3665-0012-44888724-2003 114 20 0,80% from amount 16939645.)
4370428


18 additions (4 gas natural,748% from amount 1968372 hack.)
172193


14 boiler installation
456005


Hiccupped on chapter 6
635174


Hiccupped on chapter 16
11391402
844836
Hiccupped on chapter 14 gas natural,748% from amount 1968372 hack.)
172193


14 boiler installation
456005


Hiccupped on chapter 6
635174


Hiccupped on chapter 16
11391402
844836
Hiccupped on chapter 14, montage and takedown of the bore equipment gas natural,9
-1)
1


Note- Weight of whole complex PHC is accepted 15 kN


The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05.


Name of the functioning or expenseses Cost whole gas natural,'7 (20 gas natural,90% from amount 10861872 hack.) 2813224

Hiccupped on chapter 7 281322

Chapter 8

Planned accumulations

16 accumulations on total of the direct expenseses on chapter 14,'7 (20, 6
10861872
807680
GLAVA'7



Additional expenses



15 costs on total 14, m weight, montage and takedown of the installation for test the bore holes
1632702
165715
3 and montage without transportation workman
326540
33143
4 and takedown (20 gas natural, of the buildings,748% from amount 1968372 hack.) 172193

14 boiler installation 456005

Hiccupped on chapter 6 635174

Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14 gas natural, not taken into account rate winter
52663
35145
Hiccupped on chapter 2
2021035
238101
GLAVA'3



Boring and fastening the bore hole



7 bore holes
4173128
276057
8 bore holes
2482360
73935
Hiccupped on chapter 3
6655488
349992





Chapter 4



Test the bore hole on productivity



9 object
1224437
213152
10 object



Hiccupped on chapter 4
1224437
213152





Chapter 5



11-geophisical functioning (6,175
-1)
1


Filter with silenced hole FS-114
THAT 39-5748694-28-99 114 (132 on hard )
102
200
49.7
25


Paker hydraulic PGMC 114
TU3665-0012-44888724-2003
144
97
0 gas natural,9 -1) 1

Note- Weight of whole complex PHC is accepted 15 kN

The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05.

Name of the functioning or expenseses Cost whole gas natural,1% from amount 22642556 hack.) 22642

Chapter 11

Design and prospecting functioning

24 functioning

25 functioning

26 and OKR

Hiccupped on chapter 11

Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16].

6.11 Estimated payment construction second stem

The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars gas natural,15 % from amount 7879925 hack.)
11819


21 and cargo by air transport
1103162


22
(3,00% from amount 16939645 hack.) 508189

Hiccupped on chapter 9 6806073

Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836









Continuation of the table 6.39 1 2 3 Chapter 10

23 control (0,00 % from amount 13675096.)
2735019


Hiccupped on chapter 18
16939645
844836
Chapter 9



Other functioning and expenseses



17 bonus and other additional charges (25 gas natural,'6, kN
external internal
1
2
3
4
5
6
7
8
9
Hvostovik 114 mms Shoe BK114.1
TU3665-0012-44888724-2003
114
20
0 gas natural, 6 10861872 807680 GLAVA'7

Additional expenses

15 costs on total 14,748% from amount 1968372 hack.) 172193

14 boiler installation 456005

Hiccupped on chapter 6 635174

Hiccupped on chapter 16 11391402 844836 Hiccupped on chapter 14, montage and takedown of the installation for test the bore holes
1632702
165715
3 and montage without transportation workman
326540
33143
4 and takedown (20,15 % from amount 7879925 hack.) 11819

21 and cargo by air transport 1103162

22 (3 gas natural, sht. diameter gas natural,90% from amount 10861872 hack.)
2813224


Hiccupped on chapter 7
281322


Chapter 8



Planned accumulations



16 accumulations on total of the direct expenseses on chapter 14 gas natural,ne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965). Work on are conducted in accordance with [16].

6.11 Estimated payment construction second stem

The Estimated payment construction second stem is presented in table 6.39. Table 6.38 - a Technological rig Name and diameter of the pillars,175
-1)
1


Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003
114
20
0,4% from amount 16939645 hack.)
745344


19 motor transport
67131


20 functioning (0,175 -1) 1

Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25

Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0, rub. Direct expenseses
in t.'ch. main salary worker
1
2
3
GLAVA'1



Starting-up functioning to construction of the bore hole



1 platforms,748% from amount 79750 hack.) 6976

13 functioning (8 gas natural,'7 (20 gas natural,72% from amount 7879925/552920)
529530
37156
Hiccupped on chapter 5
529530
37156











Continuation of the table 6.39
1
2
3
Chapter 6



Additional expenseses at construction of the bore holes at winter time



12 functioning to construction of the bore hole (8,'6 gas natural,00 % from amount 13675096.) 2735019

Hiccupped on chapter 18 16939645 844836 Chapter 9

Other functioning and expenseses

17 bonus and other additional charges (25 gas natural,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6 gas natural,4% from amount 16939645 hack.) 745344

19 motor transport 67131

20 functioning (0,15 % from amount 7879925 hack.) 11819

21 and cargo by air transport 1103162

22 (3,'6 chapters without commercial-geophisical functioning (25,72% from amount 7879925/552920)
529530
37156
Hiccupped on chapter 5
529530
37156











Continuation of the table 6.39
1
2
3
Chapter 6



Additional expenseses at construction of the bore holes at winter time



12 functioning to construction of the bore hole (8 gas natural, mm length (height),175
-1)
1


Filter with silenced hole FS-114
THAT 39-5748694-28-99 114 (132 on hard )
102
200
49.7
25


Paker hydraulic PGMC 114
TU3665-0012-44888724-2003
144
97
0, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1

Starting-up functioning to construction of the bore hole

1 platforms, rub. Direct expenseses
in t.'ch. main salary worker
1
2
3
GLAVA'1



Starting-up functioning to construction of the bore hole



1 platforms gas natural, m weight gas natural,15 % from amount 7879925 hack.)
11819


21 and cargo by air transport
1103162


22
(3 gas natural,00% from amount 16939645 hack.)
508189


Hiccupped on chapter 9
6806073


Hiccupped on chapter 19
23745718
844836
Hiccupped on chapter 19 for deduction 21
22642556
844836















Continuation of the table 6.39
1
2
3
Chapter 10



23 control (0, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20 gas natural, m weight gas natural, construction of the access way, line of the transmissions and others, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3

Boring and fastening the bore hole

7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992



Chapter 4

Test the bore hole on productivity

9 object 1224437 213152 10 object

Hiccupped on chapter 4 1224437 213152



Chapter 5

11-geophisical functioning (6 gas natural,748% from amount 79750 hack.) 6976

13 functioning (8,9
-1)
1


Note- Weight of whole complex PHC is accepted 15 kN


The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05.


Name of the functioning or expenseses Cost whole, pipe line gas natural, kN
external internal
1
2
3
4
5
6
7
8
9
Hvostovik 114 mms Shoe BK114.1
TU3665-0012-44888724-2003
114
20
0,00% from amount 16939645 hack.) 508189

Hiccupped on chapter 9 6806073

Hiccupped on chapter 19 23745718 844836 Hiccupped on chapter 19 for deduction 21 22642556 844836









Continuation of the table 6.39 1 2 3 Chapter 10

23 control (0 gas natural,00 % from amount 13675096.)
2735019


Hiccupped on chapter 18
16939645
844836
Chapter 9



Other functioning and expenseses



17 bonus and other additional charges (25, without transportation workman
79750
6077
2 on of the grounds
245988
358
Hiccupped on glave'1
325738
6435
GLAVA'2



Construction and stripping gas natural, not taken into account rate winter 52663 35145 Hiccupped on chapter 2 2021035 238101 GLAVA'3

Boring and fastening the bore hole

7 bore holes 4173128 276057 8 bore holes 2482360 73935 Hiccupped on chapter 3 6655488 349992



Chapter 4

Test the bore hole on productivity

9 object 1224437 213152 10 object

Hiccupped on chapter 4 1224437 213152



Chapter 5

11-geophisical functioning (6,'6,80% from amount 16939645.)
4370428


18 additions (4, rub. Direct expenseses in t.'ch. main salary worker 1 2 3 GLAVA'1

Starting-up functioning to construction of the bore hole

1 platforms gas natural,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156







Continuation of the table 6.39 1 2 3 Chapter 6

Additional expenseses at construction of the bore holes at winter time

12 functioning to construction of the bore hole (8, sht.
diameter,80% from amount 16939645.) 4370428

18 additions (4 gas natural,0% from amount 1632702/165715)
9130
4098
5 and takedown (on integrated estimation)
1968372
202956
6,0% from amount 1632702/165715) 9130 4098 5 and takedown (on integrated estimation) 1968372 202956 6,6 8

Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003 132 97 7 gas natural,95
-1)
1


Muff MC1.114.000 TU3665-0012-44888724-2003
114
97
2 gas natural,9 -1) 1

Note- Weight of whole complex PHC is accepted 15 kN

The Table 6.39 - a Consolidated estimated payment of the cost construction second stem on Urengoyskom in the prices on 01.09.05.

Name of the functioning or expenseses Cost whole, mm length (height),1% from amount 22642556 hack.) 22642

Chapter 11

Design and prospecting functioning

24 functioning

25 functioning

26 and OKR

Hiccupped on chapter 11

Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965).
Work on are conducted in accordance with [16].


6.11 Estimated payment construction second stem


The Estimated payment construction second stem is presented in table 6.39.
Table 6.38 - a Technological rig Name and diameter of the pillars,90% from amount 10861872 hack.) 2813224

Hiccupped on chapter 7 281322

Chapter 8

Planned accumulations

16 accumulations on total of the direct expenseses on chapter 14 gas natural, not taken into account rate winter
52663
35145
Hiccupped on chapter 2
2021035
238101
GLAVA'3



Boring and fastening the bore hole



7 bore holes
4173128
276057
8 bore holes
2482360
73935
Hiccupped on chapter 3
6655488
349992





Chapter 4



Test the bore hole on productivity



9 object
1224437
213152
10 object



Hiccupped on chapter 4
1224437
213152





Chapter 5



11-geophisical functioning (6 gas natural,95
-1)
1


Muff MC1.114.000 TU3665-0012-44888724-2003
114
97
2, montage and takedown of the bore equipment gas natural,6
8


Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003
132
97
7 gas natural, construction of the access way gas natural, montage and takedown of the bore equipment,'6 chapters without commercial-geophisical functioning (25, sht.
diameter gas natural, line of the transmissions and others gas natural, mm Name element of the rig Cipher element of the rig The Normative documents on fabrication Technical feature Amount gas natural,175 -1) 1

Filter with silenced hole FS-114 THAT 39-5748694-28-99 114 (132 on hard ) 102 200 49.7 25

Paker hydraulic PGMC 114 TU3665-0012-44888724-2003 144 97 0 gas natural, sht. diameter,7
-1)
1


Pipe 114 NKT 114 GUESTS 633-80
114
102
70
15 gas natural,4% from amount 16939645 hack.) 745344

19 motor transport 67131

20 functioning (0 gas natural,0% from amount 1632702/165715)
9130
4098
5 and takedown (on integrated estimation)
1968372
202956
6 gas natural, mm length (height) gas natural,7
-1)
1


Pipe 114 NKT 114 GUESTS 633-80
114
102
70
15,00% from amount 16939645 hack.)
508189


Hiccupped on chapter 9
6806073


Hiccupped on chapter 19
23745718
844836
Hiccupped on chapter 19 for deduction 21
22642556
844836















Continuation of the table 6.39
1
2
3
Chapter 10



23 control (0 gas natural, of the buildings gas natural,748% from amount 79750 hack.)
6976


13 functioning (8, of the buildings, mm Name element of the rig Cipher element of the rig
The Normative documents on fabrication Technical feature Amount,'7 (20, pipe line gas natural, construction of the access way, montage and takedown of the bore equipment,7 -1) 1

Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15 gas natural,72% from amount 7879925/552920) 529530 37156 Hiccupped on chapter 5 529530 37156







Continuation of the table 6.39 1 2 3 Chapter 6

Additional expenseses at construction of the bore holes at winter time

12 functioning to construction of the bore hole (8 gas natural, without transportation workman
79750
6077
2 on of the grounds
245988
358
Hiccupped on glave'1
325738
6435
GLAVA'2



Construction and stripping , construction of the access way gas natural,95 -1) 1

Muff MC1.114.000 TU3665-0012-44888724-2003 114 97 2, montage and takedown of the installation for test the bore holes 1632702 165715 3 and montage without transportation workman 326540 33143 4 and takedown (20,175 -1) 1

Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0 gas natural, of the buildings gas natural, 6
10861872
807680
GLAVA'7



Additional expenses



15 costs on total 14 gas natural, 6 10861872 807680 GLAVA'7

Additional expenses

15 costs on total 14 gas natural,175 -1) 1

Valve inverse PHC1.114/168.080 TU3665-0012-44888724-2003 114 20 0,6
8


Lavaliere cemented by PHC3.114/168 TU3665-0012-44888724-2003
132
97
7, pipe line, pipe line,1% from amount 22642556 hack.)
22642


Chapter 11



Design and prospecting functioning



24 functioning



25 functioning



26 and OKR



Hiccupped on chapter 11



Hiccupped on chapter 111 for deduc, mm length (height) gas natural,1% from amount 22642556 hack.)
22642


Chapter 11



Design and prospecting functioning



24 functioning



25 functioning



26 and OKR



Hiccupped on chapter 11



Hiccupped on chapter 111 for deducne step by direct way. Cementirovanie is realized through muff by solution on base of the cement PCT I-G-CC-1 density 1920 kg/m3 with using caustic powder (PMK-75) and viscosity (Tiloza E 2965).
Work on are conducted in accordance with [16].


6.11 Estimated payment construction second stem


The Estimated payment construction second stem is presented in table 6.39.
Table 6.38 - a Technological rig Name and diameter of the pillars gas natural,7 -1) 1

Pipe 114 NKT 114 GUESTS 633-80 114 102 70 15,748% from amount 79750 hack.)
6976


13 functioning (8 gas natural


Navigation:

» gas grills
» gas furnace
» natural gas
» gas mileage
» gas fireplace
» gas credit card
» cheap gas
» gas scooter
» gas masks
» gas fireplaces
» gas tank
» local gas prices
» gas grill
» gas card
» gas powered scooter
» gas logs
» gas range
» gas furnaces
» oil and gas
» radon gas
» calibration gas
» fireplace gas valve
» furnace gas valve
» cheapest gas
» gas powered scooters
» gas pump
» british gas
» gas station
» gas stove
» gas stoves
» gas price
» corner gas
» gas credit cards
» gas cooking stove
» gas stations
» gas prices williamsburg
» gas cards
» cheap gas scooter
» southern california gas company
» gas generator
» gas golf cart
» cheap gas near you
» gas heater
» gas water heater
» gas dryer
» industrial gas
» 24 gas stoves
» gas ranges
» gas log
» toronto gas prices
» gas natural
» gas cooktop
» georgia natural gas
» weber gas grills
» gas tanks
» motorcycle gas tanks
» gas pumps
» gas heaters
» exhaust gas recirculation valve
» home depot gas furnace
» cheap gas scooters
» electricity scottish gas
» gas flow meter
» gas motor scooter
» gas milage
» natural gas grills
» shell gas card
» gas blower
» gas rc cars
» gas oven
» gas station franchise
» gas scottish
» gas turbine
» the gas company
» gas can
» gas trimmer
» e85 gas stations
» gas generators
» natural gas grill
» gas station for sale
» oil gas
» propane gas
» free gas
» gas company
» gas cooktops
» natural gas prices
» gas fires
» gas trimmers
» stomach gas
» gas scooter parts
» hydrogen gas storage
» fast gas scooter
» gas powered generators
» tear gas
» cheap gas prices
» gas powered rc cars
» stove gas
» greenhouse gas
» weber gas grill
» gas space heaters
» gas skateboard
» ducane gas grills
» tear gas pen
» gas forge
» mobile gas
» remote control gas car
» michigan gas prices
» equitable gas
» sportster gas tanks
» gas analyzer
» gas fire places
» infant gas
» gas power washer
» harley gas cap
» nerve gas
» m40 gas mask
» gas powered r c
» slide in gas range
» gas pressure washers
» gas pedal pumping
» gas wall heaters
» speedway gas
» gas gift cards
» gas space heater
» gas valves
» natural gas generators
» baby gas
» will driving 55 mph save money on gas
» gilbarco gas pump
» todo gas tokyo race
» used gas scooter
» gas griddle
» furnace gas
» gas pole saw
» ventless gas logs
» gas burners
» vent free gas fireplaces
» club car gas
» gas price comparison
» visible gas pumps
» 1969 mustang gas cap
» gas chandelier
» inert gas
» jenn air gas grills
» gas cook top
» ge gas range
» fiesta gas grills
» best gas prices
» auschwitz gas chambers
» natural gas water heater
» propane gas prices
» gas barbecue
» gas powered water pump
» gas grill burner
» hess gas station
» gas meters
» suv gas mileage
» gas mask girls
» speedway gas station
» prescription medication for gas
» antique gas stoves
» bhopal gas tragedy
» sewer gas
» gas bicycle engine
» gas tank sending unit
» grill gas
» gas kiln
» ethanol gas
» gas bottle
» gas prices ohio
» mapp gas
» car gas
» gas station light
» sugar in gas tank
» gas station sign
» gas chromatograph
» scooters gas
» gas leaf blowers
» increase gas mileage
» nickelodeon gas
» natural gas stocks
» passing gas
» gas radio control
» charbroil gas grills
» baltimore gas and electric
» natural gas companies
» vent free gas stoves
» harley gas caps
» bad credit gas cards
» nitrogen gas
» gas giant
» plastic gas tank
» todo gas 2
» thermos gas grills
» lighted gas sign
» gas relief
» natural gas prices opal 2006
» gas go karts
» improve gas mileage
» gas barbeque


Content Map

  Tags cloud:

gas scooters grills furnace natural mileage fireplace credit card cheap masks fireplaces tank local powered logs oil and radon calibration valve cheapest pump british station stove stoves corner cards cooking stations williamsburg southern california company golf cart near you water dryer industrial 24 ranges toronto cooktop georgia motorcycle pumps exhaust recirculation home depot electricity scottish shell blower cars oven franchise turbine can e85 sale propane free cooktops fires trimmers stomach parts hydrogen storage tear skateboard ducane pen forge mobile equitable analyzer pressure washers pedal pumping wall valves baby gilbarco pole saw ventless burners club visible chandelier jenn air fiesta best hess meters prescription medication antique bhopal tragedy sending unit ethanol bottle ohio mapp light sugar sign leaf blowers increase stocks radio baltimore companies caps bad nitrogen giant lighted karts


  Friendly links:

 + gas scooters


3Kaimana.com

3FN marketing

tear gas
© Copyright gas scooters. All rights reserved.
16.12.2007